Into phase 2 – Flimwell moves on
Into phase 2 – Flimwell moves on Douglas fir Cruck-Frame Offices replace Sweet Chestnut at the Woodland Enterprise Centre A version of this piece first appeared in Green Building, Volume 17 no 3, Winter 2007
Into phase 2 – Flimwell moves on Douglas fir Cruck-Frame Offices replace Sweet Chestnut at the Woodland Enterprise Centre A version of this piece first appeared in Green Building, Volume 17 no 3, Winter 2007
If carpenter ants built future systems As stand-out structure at Doncaster’s turn of the millennium Earth Centre space frame canopy showed what lightweight timber structures could do In Fourth Door Review 6 – 2003
PV’s plus timber FCB Studio’s timber space frame lightens the load at the Earth Centre, Doncaster In Annular – an earlier version of this piece appeared in Building for A Future, volume 11, no 2 Spring 2002